You are currently viewing: News



24-10-2017

Yokogawa releases CENTUM® VP R6.05 integrated production control system

Yokogawa Electric Corporation announces that it will release CENTUM® VP R6.05, an enhanced version of its flagship integrated production control system, on October 24.

The latest CENTUM release features a new processor module with a Yokogawa designed microprocessor that employs large-scale integration (LSI). By using this system LSI in place of a commercially available product, Yokogawa eliminates the disruptions that can occur when a product is modified or discontinued. This release also features an improved engineering function that speeds up project execution by achieving savings in configuration and installation time. These enhancements cover the entire control system lifecycle, from installation and start-up to end of service.

Development Background
The CENTUM VP control system provides an optimum operation, monitoring, and engineering environment for every phase of the plant lifecycle, from engineering, installation, and start-up to maintenance, renovation, upgrade, and end of service. Starting with release 6.01 in 2014, CENTUM VP design has been guided by the CENTUM VP R6 value propositions of Smart Engineering, Advanced Operation, System Agility, and Sustainable Plant. Release 6.05 offers strengthened functions that fulfil the value propositions of Smart Engineering and Sustainable Plant.

Since first releasing CENTUM in 1975, Yokogawa has continued to enhance and optimize this system with the aim of ensuring backwards compatibility and long-term ease of use. For long-term stability in operations, it is necessary to continue offering products that have the same specifications. However, as many electronic components have short lifecycles, there is always the risk that their specifications will change over time or that they may be eliminated altogether. To address this problem, Yokogawa has developed and uses its own system LSI in this controller.

Enhancements
1. CP471 processor module with Yokogawa-developed system LSI
For the CENTUM VP field control unit (FCU), Yokogawa has developed the CP471 processor module. The new CP471 processor module has a new system LSI of Yokogawa's own design. Application of a Yokogawa product eliminates the possibility of disruptions due to the modification or discontinuation of a commercially available product. This shall ensure the long-term availability of this key component.

2. Reduced test time for the AD Suite integrated engineering environment
Yokogawa developed the Automation Design Suite (AD Suite) engineering environment by leveraging its wealth of project engineering knowhow, and released it as part of CENTUM VP R6.01. AD Suite is a powerful yet flexible engineering environment that helps engineers produce quality work and improves efficiency over the entire project lifecycle.

AD Suite takes a modular approach to the development of control applications, and the modules created with this software are reusable in similar applications. AD Suite empowers CENTUM customers by giving them the choice between the use of a standard set of modules developed by Yokogawa or the creation of custom modules using a test tool provided within AD Suite. With the modifications to the test tool implemented in R6.05, the time needed to create a module has been reduced by more than 50%.

Major Target Markets
Process industries such as oil and natural gas, petrochemicals, chemicals, electric power, pulp and paper, pharmaceuticals, foods, iron and steel, and water and wastewater
Sponsor : 

Other News Items

KROHNE at ACHEMA: Innovations in industrial process measurement

At ACHEMA 2018, KROHNE will be presenting innovations for the process industries. Visitors are welcome on booth A13 in hall 11.1 to learn about current and future developments ...

23-04-2018

Kaspersky Lab identifies infrastructure of Crouching Yeti

Kaspersky Lab has uncovered infrastructure used by the well-known Russian-speaking APT group Crouching Yeti, also known as Energetic Bear, which includes compromised ...

23-04-2018

McDermott and CB&I announce global name and brands for future combined company

McDermott International, Inc.  and CB&I today announced that, following the closing of the combination, the combined company intends to retain the name McDermott. ...

23-04-2018

CNOOC’s new laboratory acquires high throughput technology from hte

hte – the high throughput experimentation company equips CNOOC Research Institute of Refining and Petrochemicals (a subsidiary of CNOOC) with a high throughput ...

19-04-2018

Lukoil commissions gas processing complex in Uzbekistan

Today LUKOIL has commissioned a Gas Processing Complex at the Kandym fields cluster in Uzbekistan. The official opening ceremony was attended by the President of the ...

19-04-2018

Mammoet brings Oman's biggest petrochemical project closer to completion

Mammoet has successfully completed the safe transport and installation of four 1180-ton NGL bullet tanks for Oman’s biggest petrochemical project, Liwa Plastics ...

19-04-2018

New SOLA iQ online sulfur analyzer from Thermo Scientific

The new Thermo Scientific SOLA iQ online sulfur analyzer helps technicians, engineers and managers in the oil and gas industry measure total sulfur content of liquid ...

18-04-2018

SNC-Lavalin awarded Wasit gas plant installation contract by Saudi Aramco

SNC-Lavalin has been appointed by Saudi Aramco to install additional facilities for a major gas processing facility in Saudi Arabia’s Eastern Province. Under ...

18-04-2018

Merichem awarded new LO-CAT® project

Merichem Company, a global partner serving the oil and gas industries with focused technology, chemical, and service solutions, announced today that it was awarded a ...

18-04-2018

Fluor awarded contract for Marathon Petroleum’s STAR program at Galveston Bay refinery

Fluor Corporation announced today that it was selected by a division of Marathon Petroleum Corporation (MPC) to execute the engineering and procurement scope for MPC’s ...

18-04-2018