Number: 169

Display:

  • CFD study of a VDU feed inlet device and wash bed

    Oct-2009

    Analysis of vapour velocity profiles at the entry to the wash zone of a VDU column enables a higher feed rate and improved output quality

  • Cost-effective and reliable revamps

    Jul-2009

    Test run hydraulic measurements and analysis, together with equipment know-how, can help refiners identify profitable, low-cost revamp opportunities

  • Demystifying the zero entrainment myth for vacuum column flash zones

    Apr-2009

    One of the recurring questions about refinery vacuum tower operation is the issue of flash zone entrainment and the operation of the wash section.

  • Stabilisation 
of asphaltenes

    Jan-2009

    Asphaltenes can plug refinery equipment and can decrease or stop production. Stabilisation of asphaltene particles is an efficient and cost-effective way ...

  • Online cleaning of 
process equipment

    Oct-2008

    In the interest of time and cost savings, online cleaning prior to shutdown can reduce the duration and complexity of refinery turnarounds, as demonstrated ...

  • Unlocking current 
refinery constraints

    Apr-2008

    When processing heavy feeds, technology based on residuum supercritical solvent extraction provides higher volumes of gas oil and DAO for conversion units. ...

  • Improving crude vacuum 
unit performance

    Mar-2008

    When simulating or designing an unconventional heavy oil/bitumen vacuum crude unit, the sharing of operating data on cracked gas make, stripping section ...

  • Identifying very small 
equipment leaks

    Jan-2008

    Very small leaks in feed/effluent exchangers can be identified using chemical tracing. This online technique can detect leaks as low as 5.0 ppm, avoiding ...

  • Canadian crude processing challenges

    Jan-2008

    Vacuum unit design influences liquid volume yields, run length, product 
yield and product quality when processing bitumen crude oils

  • Oil/water interface control for desalters

    Oct-2007

    Profiling instrument provides vertical real-time phase density measurement in desalter vessels. Benefits include reduced process upsets from interface ...

  • Revamping atmospheric crude heaters

    Sep-2007

    Revamp of an atmospheric crude unit heater suffering from coking caused by asphaltene precipitation resulted in an increased heater run length

  • Identifying poor heat exchanger performance

    Sep-2007

    Identifying root causes of poor crude unit debutaniser reboiler performance and low-cost solutions that help meet exchanger original design conditions

  • Lube vacuum column revamp

    Sep-2007

    Primary goals of a lube vacuum column revamp were to increase lube product fractionation and minimise HVGO product contaminants

  • Crude overhead system design considerations

    Jul-2007

    Proper crude unit overhead system design is important when building a new unit or revamping an existing one to process different crudes

  • Gamma scanning fractionators

    Jan-2007

    Gamma scanning is a powerful tool that can be used to determine the cause of flooding and regain column efficiency. Debutaniser capacity and performance ...

  • Vacuum unit design for high 
metals crudes

    Jan-2007

    Vacuum unit design can influence vacuum gas yield, product quality and run length. A wet vacuum unit with residue stripping achieves the highest cutpo ...

  • Evaluating opportunity crude processing

    Oct-2006

    Is processing opportunity crudes for every refiner? Technical challenges and economic benefits from processing high-acid crudes and bottom-of-the-barrel ...

  • Vacuum unit pressure control

    Sep-2006

    Operational issues such as higher heater duty and column pressure must be weighed against avoiding residue entrainment in HVGO

  • Refinery CO2 challenges: part III

    Jul-2006

    For the prediction of CO2 emissions from a refinery, simple correlations are not always sufficient. A rigorous simulation tool that includes fractionation ...

  • Designing vacuum units

    Apr-2006

    When designing vacuum units for processing heavy Canadian crudes, reliability costs can be high if the feedstock’s thermal instability is not fully ...

  • Increasing crude unit preheat

    Jan-2006

    Cost-effective exchanger network solutions need to rely on more than just pinch technology if they are to be successful

  • Diesel and VGO recovery

    Oct-2005

    Fundamental design considerations influencing diesel and vacuum gas oil (VGO) recovery when revamping existing or designing grassroots crude units. By ...

  • Deep-cut vacuum unit design

    Oct-2005

    Process modelling and equipment know-how are needed to design deep-cut vacuum units that operate reliably at high temperature and low pressure

  • An atmospheric crude tower revamp

    Jul-2005

    Overall gas oil yield was maintained with heavier crudes due to a crude tower revamp. The revamp allowed for a crude heater outlet temperature reducti ...

  • Increasing vacuum tower performance

    Oct-2004

    Advantages of using gravity flow liquid distributors in services where, historically, spray nozzles have been used, specifically in refinery vacuum tower ...