You are currently viewing: News



28-09-2018

New methods of explosion pressure relief: REMBE® TARGO-VENT

Comprehensive combustible dust explosion protection does not necessarily have to be expensive or complicated. An innovative technology makes it possible to divert the shock wave and flames of an explosion in a controlled manner. The result: the required safety area is reduced, so valuable usable area is increased and personnel/ equipment are protected from the explosion’s effects.

Combustible dust explosions occur within a few milliseconds, yet leave behind considerable damage. Different approaches to protecting against the ravages of the explosion are implemented to limit this damage.

Explosion panels are often used in facilities where release of the explosion to the surrounding external area is possible. Explosion panels, which relieve the explosions by “bursting” at a predetermined pressure point, are very economical and relatively easy to manage. However, this type of traditional explosion pressure relief presents a big problem for many facility operators – extensive safety areas have to be set up around the relief area to protect people, equipment and the surrounding areas. These areas become unusable space.

REMBE® TARGO-VENT is an opening angle limiter developed especially for REMBE® Explosion Panels which guides the pressure relief specifically into areas in which there is no danger to the adjoining infrastructure. TARGO-VENT absorbs the enormous repulsive forces of explosion energy and guides the flames and shock wave in the desired direction.

Depending on the particular application/equipment, the flames and shock wave are diverted at a defined angle of approx. 30° to approx. 45° upwards or to the side so facility operators can minimize the safety areas around the vent opening. The usable area is increased.

A further advantage of TARGO-VENT: the top module is made in standard explosion panels sizes, so that it may be retrofit on existing REMBE® Explosion Panels without a problem. Retrofits or building additions are protected by TARGO-VENT without the need to significantly alter the explosion protection plan of the existing facility.

TARGO-VENT is attached directly to the REMBE® Explosion Panels—an additional space-saver. There is no need for expensive baseplates or reinforcements. The system is made of maintenance-free stainless steel materials and, in combination with REMBE® Explosion Panels, is type-tested in accordance with the ATEX Directive 94/9/EC (ATEX 114) and authorized in accordance with (FSA 13 ATEX 1637).



Sponsor : 

Other News Items

Emerson completes acquisition of iSolutions Inc

Emerson has acquired iSolutions Inc., a Canadian-based consulting group with expertise designing and implementing data management solutions. iSolutions provides organisations ...

11-12-2018

Matrix Service to construct ionic alkylation unit at Salt Lake City refinery

Matrix Service Company announced today that Chevron has awarded its subsidiary, Matrix Service Inc., construction of the first-ever alkylation unit in the U.S. designed ...

10-12-2018

Alfa Laval wins energy-efficiency order

Alfa Laval – a world leader in heat transfer, centrifugal separation and fluid handling – has won an order to supply compact heat exchangers to a petrochemical ...

10-12-2018

McDermott awarded FEED contract for North Dakota grassroots refinery

McDermott International, Inc. announced today a sizeable* contract award for front-end engineering design (FEED) services of the Davis Refinery Project in Billings County, ...

06-12-2018

Rüeger releases a new high-precision temperature sensor

The Swiss manufacturer Rüeger SA is introducing its new ThermoHybrid, a high-precision temperature sensor for process applications. This modern version of a constant-volume ...

03-12-2018

Exxonmobil awards Matrix Service FCCU Turnaround at Joliet refinery

Matrix Service Company announced today that its subsidiary, Matrix Service Inc., has been awarded the Fluidized Catalytic Cracking Unit (FCCU) turnaround by Exxon ...

03-12-2018

Woodside selects Jacobs to deliver brownfields engineering and procurement services

Jacobs Engineering Group Inc. has been awarded a three-year outline agreement from Woodside Energy Limited to provide brownfields engineering and procurement services ...

02-12-2018

Siemens and ADNOC celebrate inauguration of Taweelah gas compression plant

The Abu Dhabi National Oil Company (ADNOC) inaugurated its Taweelah Gas Compression Plant, ensuring uninterrupted gas supplies to major Abu Dhabi industries and the UAE’s ...

29-11-2018

Rotterdam refinery expansion enters final stage

ExxonMobil Basestock  announced today several key developments at its Rotterdam refinery to meet the company’s most stringent base stocks manufacturing quality ...

29-11-2018

Borealis selects NAPCON Controller applications from Neste Engineering Solutions

Neste Engineering Solutions has been awarded the renewal of Borealis Porvoo Aromatics Plant platform covering Advanced Process Control System (APC) with NAPCON Controller. ...

29-11-2018