17-04-2013
JSC "NIIK" selects AVEVA for integrated engineering & design
AVEVA announced today that JSC “NIIK” has implemented solutions within the AVEVA Plant software portfolio for the engineering and design of chemical facilities. By adopting an Integrated Engineering & Design (IE&D) approach, JSC “NIIK” can ensure consistency in the development of process flow diagrams and electrical equipment, through to the creation of the 3D model and the detailed design of the associated steel structure. This will greatly enhance the efficiency of major capital projects, reducing time and cost.
“Creating an integrated approach to our working environment was an important factor in selecting AVEVA and will result in a number of advantages for an engineering company like ourselves”, said Oleg Kostin, General Director of JSC "NIIK”. “Creating exact specifications and testing the correct position of system components will be far easier, saving time and cost across a project compared to our current solution. The IE&D approach allows us to create and maintain consistent designs throughout the project lifecycle. Our team of designers can work together, clearly identifying changes and controlling them to reduce disruptive and expensive rework. We look forward to a long and productive relationship with AVEVA.”
Evgeny Fedotov, Senior Vice-President Russia, India & Middle East, AVEVA, added: “JSC “NIIK” is one of the leading design institutes in the chemical industry. This new contract will enable JSC “NIIK” to gradually build up its design capabilities and integrate its engineering across a suite of solutions in order to increase both the quality and quantity of projects that it can complete. JSC “NIIK” will use AVEVA software solutions across a range of projects including design and survey work during the construction, reconstruction, expansion, modernisation, and revamp of industrial facilities. JSC “NIIK” can trust that it has a set of products that will produce a high-quality 3D model and make work processes simple, clear and understandable at each stage. AVEVA Plant technology enables improved quality and reduced time scales while minimising risk. These very tangible business benefits are why so many companies are selecting AVEVA’s solutions”.
News Category:
-
John Crane unveils Type 8628VL mechanical seal
John Crane has launched the Type 8628VL, a next generation mechanical seal engineered to solve the oil and gas industry's toughest challenges: maintaining sealing integrity ...
09-09-2025
-
Clariant to supply catalyst to the world's largest electric steam methane reformer
Clariant, a sustainability-focused specialty chemical company, today announced a supply agreement with SYPOX to manufacture and deliver catalysts for what will be the ...
09-09-2025
-
Worley receive FEED verification contract for renewable diesel and aviation fuel project
Worley has been awarded a contract by Preem for Front-End Engineering Design (FEED) verification for the planned conversion of the ICR plant at the Lysekil refinery in ...
08-09-2025
-
Honeywell to optimise production at AMIGO LNG export terminal in Mexico
Honeywell today announced that its modular liquefied natural gas pretreatment technology and Integrated Control and Safety Systems (ICSS) will be adopted at AMIGO LNG ...
01-09-2025
-
Covestro selects EnviNOx® technology for its Baytown site
thyssenkrupp Uhde has successfully delivered and commissioned its proprietary EnviNOx® technology to Covestro’s Baytown, Texas, facility. The advanced emission control ...
01-09-2025
-
REZEL Catalysts Corporation, a leading global catalyst manufacturer and licensor, and Aramco, one of the world's leading integrated energy and chemicals companies, announced ...
26-08-2025
-
Wood to provide project management consultancy services on Turkey's largest polypropylene plant
Wood, a global leader in consulting and engineering, is providing project management consultancy (PMC) services to develop Turkey's largest polypropylene plant and associated ...
21-08-2025
-
thyssenkrupp Uhde completes Pre-FEED for the Portland renewable fuels project
thyssenkrupp Uhde has completed the Pre-FEED phase for the Portland Renewable Fuels Project in collaboration with HAMR Energy. The project, located in Victoria, Australia, ...
21-08-2025
-
Accelerating the Demonstration Project for Its New Technology Contributing to the Petrochemical Industry’s Effort to Switch to Alternative Feedstocks Sumitomo ...
20-08-2025
-
Vioneo selects Lummus as its Polypropylene partner for a new grassroots plant in Antwerp
Lummus Technology, a global provider of process technologies and value-driven energy solutions, announced Vioneo has selected its Novolen® polypropylene (PP) technology ...
19-08-2025