logo

Back

Question

  • New constructed crude tank (Double Deck Pontoon Floating Roof) is going receive crude oil (29 API). What should be the status of the tank? Filled with water just up to floating level or keep the tank empty?

    May-2022

Answers


  • Srinivasa Reddy, KIPIC, v.reddy@kipic.com.kw

    For receipt of crude into floating roof tank, keep tank in empty condition before receipt. Receipt rates to be controlled and limit the receipt inlet lines velocity to maximum 1 m/s till the roof floats. Above the roof floating levels, receipt rates can be increased to design flows.

     

    May-2022



  • Responsive image Shut-off valves
  • Responsive image Neles is now part of Valmet
  • Responsive image Sweet Solutions® just got sweeter
  • Responsive image Process catalysts
  • Responsive image ITW technologies online cleaning
  • Responsive image Why produce diesel from the vacuum unit?
  • Responsive image OpX® Digital
  • Responsive image Ethylene podcast
  • Responsive image Petrochemical Market Trends Report
  • Responsive image Refining India Conference 10- 11 October 2022
  • Responsive image Flash point testing