logo


Question

  • New constructed crude tank (Double Deck Pontoon Floating Roof) is going receive crude oil (29 API). What should be the status of the tank? Filled with water just up to floating level or keep the tank empty?

    May-2022

Answers


  • Srinivasa Reddy, KIPIC, v.reddy@kipic.com.kw

    For receipt of crude into floating roof tank, keep tank in empty condition before receipt. Receipt rates to be controlled and limit the receipt inlet lines velocity to maximum 1 m/s till the roof floats. Above the roof floating levels, receipt rates can be increased to design flows.

     

    May-2022



  • Responsive image Becht fired heaters services
  • Responsive image Book your tickets today!
  • Responsive image Axens SAF Solutions
  • Responsive image RVP in process
  • Responsive image Vacuum Systems
  • Responsive image Level and density in resid hydrocracking processes
  • Responsive image ITW technologies online cleaning
  • Responsive image Process catalysts
  • Responsive image FCC Catalysts and Additives
  • Responsive image Custom catalysts from Evonik