logo


27-08-2012

Planned maintenance at Jamnagar refinery complex

Reliance Industries Limited has scheduled a planned Maintenance turnaround of one of the Diesel Hydrotreater units of the DTA Refinery at our Jamnagar complex for a period of approximately two and a half weeks starting August 28, 2012.

This opportunity would also be utilised to carry out other maintenance and inspection jobs during this shutdown period.

During the period the other Diesel hydrotreating unit of the DTA refinery along with other units including crude processing levels are planned at normal levels.

Sponsor:

News Category:

Other News Items

  • Responsive image FCC catalyst solutions
  • Responsive image Gas Guide Issue Vol: 5
  • Responsive image Sulzer structured packings
  • Responsive image Custom Catalysts
  • Responsive image Optimize heat exchanger efficiency
  • Responsive image FCC online diagnostic services for FCCU
  • Responsive image Magcat® Textured Catalyst
  • Responsive image Neles™ XH ball valves with forward-thinking design
  • Responsive image Triple eccentric butterfly valve from OHL Gutermuth
  • Responsive image Podcasts from PAC