logo


10-05-2013

Update on Chiba refinery operation

Cosmo Oil Co., Ltd announce that the #2 Crude Distillation Unit (CDU) which has resumed operations since January 30th has been temporarily shut down for its regular maintenance (annual turnaround). The company also announce that it has began operating the #1 CDU (capacity: 100,000 barrels/day) as the #2 CDU entered turnaround. The company will continue to work towards full refinery operations, taking all necessary safety measures.

Sponsor:

News Category:

Other News Items

  • Responsive image Gas Guide Issue Vol: 5
  • Responsive image FCC catalyst solutions
  • Responsive image FCC online diagnostic services for FCCU
  • Responsive image Podcasts from PAC
  • Responsive image Custom Catalysts
  • Responsive image Optimize heat exchanger efficiency
  • Responsive image Sulzer structured packings
  • Responsive image Magcat® Textured Catalyst
  • Responsive image Triple eccentric butterfly valve from OHL Gutermuth
  • Responsive image Neles™ XH ball valves with forward-thinking design