logo


Question

  • I am currently looking after mechanical maintenance of Delayed Coker unit (DCU). We are witnessing frequent leakage issues in our plant due cyclic loading and unloading of Coke drums. Please suggest concrete solution either to resolve the issue or to mitigate the same and increase MTBF.

    May-2022

Answers


  • tariq malik, CITGO, corpus6906@yahoo.com

    Please be a bit more specific as to which equipment in the DCU you are witnessing leaks due to the cyclic nature of the process.

     

    Jun-2022



  • Responsive image Podcasts from PAC
  • Responsive image Neles™ XH ball valves with forward-thinking design
  • Responsive image Gas Guide Issue Vol: 5
  • Responsive image Custom Catalysts
  • Responsive image Sulzer structured packings
  • Responsive image FCC catalyst solutions
  • Responsive image Optimize heat exchanger efficiency
  • Responsive image Magcat® Textured Catalyst
  • Responsive image Triple eccentric butterfly valve from OHL Gutermuth
  • Responsive image FCC online diagnostic services for FCCU