19-06-2012
Jacobs receives contract from Chevron Phillips Chemical
Jacobs Engineering Group, Inc announced today it was awarded a contract from Chevron Phillips Chemical Company LP (CPChem) to provide front end engineering and design (FEED) services for two polyethylene facilities.
Officials did not disclose the contract value.
The two polyethylene facilities planned are part of CPChem's U.S. Gulf Coast (USGC) Petrochemicals Project, to be located on a site in Old Ocean, Texas near the Chevron Phillips Chemical Sweeny facility. Each facility is expected to utilize CPChem's proprietary Loop Slurry Technology.
In making the announcement, Jacobs Group Vice President Mike Autrey stated, "We look forward to expanding our long standing relationship with Chevron Phillips Chemical and are enthusiastic to contribute to the success of the U.S. Gulf Coast Petrochemical Project."
Jacobs is one of the world's largest and most diverse providers of technical, professional, and construction services.
News Category:
-
Beyond processbook & PI vision: Exploring today’s industrial analytics tools
(Webinar) - In the Manufacturing 4.0 era, industrial organizations have more data at their fingertips than ever, offering the promise of higher production rates, more ...
04-06-2024
-
MOL inaugurates its polyol complex in Tiszaújváros
MOL's EUR 1.3 billion polyol complex in Tiszaújváros, boasting a capacity of around 200,000 tonnes of polyol per year, has been inaugurated. The ceremony, addressed ...
15-05-2024
-
NEXTCHEM completes the acquisition of GasConTec
Further to the announcement made on 4 March 2024, MAIRE announces that NEXTCHEM has finalized the acquisition of 100% of GasConTec GmbH, an innovative company specialized ...
15-05-2024
-
KBR awarded digital solutions contract by OCI
KBR announced today it has been awarded a contract by OCI Global to design and deploy its proprietary operator training simulator for OCI's 3,000 metric tonnes ...
13-05-2024
-
Worley awarded Bayou Bend CCS carbon capture and storage facility contract
We’ve been selected to design and evaluate CO2 gathering, handling and sequestration facilities located along the Gulf Coast in Southeast Texas. Bayou Bend ...
13-05-2024
-
Black & Veatch delivers feasibility study for Andes Energy LNG Terminal
Global liquefied natural gas (LNG) infrastructure solutions leader Black & Veatch has completed a feasibility study for the planned Andes Energy Terminal, LNG regasification ...
09-05-2024
-
Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC
Shell Singapore Pte Ltd, a subsidiary of Shell plc, has reached an agreement to sell its Energy and Chemicals Park in Singapore to CAPGC Pte. Ltd., a joint venture company ...
08-05-2024
-
Integrated Global Services recognized for role in mega turnaround
Integrated Global Services has been recognized as a major contributor to the successful Ras Tanura Refinery 2024 Mega Turnaround and Inspection for Saudi Arabian Energy ...
08-05-2024
-
Ebara Elliott Energy to provide compressor for SAF project in Thailand
Ebara Elliott Energy, formerly Elliott Group, announces it has been contracted to provide a motor-driven recycle compressor with a variable frequency drive (VFD) for ...
07-05-2024
-
ETH Zurich select hte to provide high throughput test system designed for CO2 electroreduction
hte – the high throughput experimentation company was awarded a contract by the technical university ETH Zurich to provide a high throughput test system designed for ...
07-05-2024