15-06-2015
Industrial Cooling Solutions contract for Petronas Refinery
Lakewood, Colorado-based Industrial Cooling Solutions (ICS) announced that it has been awarded a contract to build a multimillion dollar 28-cell cooling tower at the RAPID Steam Cracker Complex Project in Johor, Malaysia. ICS was awarded the contract by Japan-based Toyo Engineering Corporation (TEC) and its consortium partner, Thailand-based TTCL Public Company Limited (TTCL). The Cracker Complex is a part of the massive $16 billion RAPID petrochemical complex being built by the Malaysian state-owned energy company, Petronas.
Tim Bozic, President of ICS, said, “The fact that TEC and TTCL selected us for this landmark project, with the contract ratified by Petronas, is a testament to our record of global engineering excellence in complex cooling tower design and supply projects. We at ICS are thrilled and honored to have been recognized in this manner.”
ICS has successfully completed cooling tower projects for TTCL and TEC in multiple countries and this multimillion dollar award represents the company’s largest single-site cooling tower to date. The concrete, back-to-back counterflow cooling tower will play a critical role in the development of the state-of-the-art RAPID refinery by reducing power use while maintaining optimum plant efficiency for maximum production output.
The RAPID integrated refinery and petrochemical complex is currently scheduled to begin operating in 2019 and will add capacity to allow Petronas to better meet strong demand for refined petroleum.
News Category:
-
Beyond processbook & PI vision: Exploring today’s industrial analytics tools
(Webinar) - In the Manufacturing 4.0 era, industrial organizations have more data at their fingertips than ever, offering the promise of higher production rates, more ...
04-06-2024
-
MOL inaugurates its polyol complex in Tiszaújváros
MOL's EUR 1.3 billion polyol complex in Tiszaújváros, boasting a capacity of around 200,000 tonnes of polyol per year, has been inaugurated. The ceremony, addressed ...
15-05-2024
-
NEXTCHEM completes the acquisition of GasConTec
Further to the announcement made on 4 March 2024, MAIRE announces that NEXTCHEM has finalized the acquisition of 100% of GasConTec GmbH, an innovative company specialized ...
15-05-2024
-
KBR awarded digital solutions contract by OCI
KBR announced today it has been awarded a contract by OCI Global to design and deploy its proprietary operator training simulator for OCI's 3,000 metric tonnes ...
13-05-2024
-
Worley awarded Bayou Bend CCS carbon capture and storage facility contract
We’ve been selected to design and evaluate CO2 gathering, handling and sequestration facilities located along the Gulf Coast in Southeast Texas. Bayou Bend ...
13-05-2024
-
Black & Veatch delivers feasibility study for Andes Energy LNG Terminal
Global liquefied natural gas (LNG) infrastructure solutions leader Black & Veatch has completed a feasibility study for the planned Andes Energy Terminal, LNG regasification ...
09-05-2024
-
Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC
Shell Singapore Pte Ltd, a subsidiary of Shell plc, has reached an agreement to sell its Energy and Chemicals Park in Singapore to CAPGC Pte. Ltd., a joint venture company ...
08-05-2024
-
Integrated Global Services recognized for role in mega turnaround
Integrated Global Services has been recognized as a major contributor to the successful Ras Tanura Refinery 2024 Mega Turnaround and Inspection for Saudi Arabian Energy ...
08-05-2024
-
Ebara Elliott Energy to provide compressor for SAF project in Thailand
Ebara Elliott Energy, formerly Elliott Group, announces it has been contracted to provide a motor-driven recycle compressor with a variable frequency drive (VFD) for ...
07-05-2024
-
ETH Zurich select hte to provide high throughput test system designed for CO2 electroreduction
hte – the high throughput experimentation company was awarded a contract by the technical university ETH Zurich to provide a high throughput test system designed for ...
07-05-2024