22-04-2020
Compressor Controls Corporation awarded multiple Arctic LNG 2 contracts
Compressor Controls Corporation (CCC), the global leader in liquefied natural gas turbomachinery controls and a division of Roper Technologies Inc., has been awarded multiple contracts for the Arctic LNG 2 project. The contracts represent the latest collaboration between Novatek and CCC, which previously worked together on turbomachinery optimization and standardization for the Yamal LNG project.
A major LNG development located in the Yamal-Nenets Autonomous Region's Gydan Peninsula, the Arctic LNG 2 project boasts an expected production capacity of 19.8 million tons per year. In CCC, Novatek has selected the world's leading turbomachinery controls expert-one that has its controls on 95.5% of the global LNG market's MTPAs.
Under the contracts, CCC will oversee the turbomachinery controls and optimization of all three 6.6 MTPA LNG trains' centrifugal compressors and expanders. In addition to spearheading anti-surge, performance, quench and other advanced controls, CCC will provide an emulator for use during the plant simulation and its eventual OTS. The company will leverage specialized local and global teams, and collaborate with the field's leading OEMs, to execute and deliver state-of-the-art control algorithms.
"These contracts recognize CCC's performance on the Yamal LNG project and allow us to continue strengthening our partnership with Novatek," said CCC Director of Global Projects, Osama Abou Shabab. "We're proud that Novatek has entrusted our global team to control all critical and non-critical machines in its hallmark Arctic LNG 2 project. CCC's field-tested, proven control techniques and algorithms will maintain and improve the project's targeted RAM."
The Arctic LNG 2 project includes constructing three LNG trains at 6.6 million tons per annum each, using gravity-based structure (GBS) platforms. The project is based on the hydrocarbon resources of the Utrenneye field. As of Dec. 31, 2018, the Utrenneye field's 2P reserves under PRMS totaled 1,138 billion cubic meters of natural gas and 57 million tons of liquids. Under the Russian classification, reserves totaled 1,978 billion cubic meters of natural gas and 105 million tons of liquids.
Project participants include NOVATEK (60%), Total (10%), CNPC (10%), CNOOC Limited (10%) and the Japan Arctic LNG, consortium of Mitsui & Co and JOGMEC (10%). OOO Arctic LNG 2 owns an LNG export license.
News Category:
-
Beyond processbook & PI vision: Exploring today’s industrial analytics tools
(Webinar) - In the Manufacturing 4.0 era, industrial organizations have more data at their fingertips than ever, offering the promise of higher production rates, more ...
04-06-2024
-
MOL inaugurates its polyol complex in Tiszaújváros
MOL's EUR 1.3 billion polyol complex in Tiszaújváros, boasting a capacity of around 200,000 tonnes of polyol per year, has been inaugurated. The ceremony, addressed ...
15-05-2024
-
NEXTCHEM completes the acquisition of GasConTec
Further to the announcement made on 4 March 2024, MAIRE announces that NEXTCHEM has finalized the acquisition of 100% of GasConTec GmbH, an innovative company specialized ...
15-05-2024
-
KBR awarded digital solutions contract by OCI
KBR announced today it has been awarded a contract by OCI Global to design and deploy its proprietary operator training simulator for OCI's 3,000 metric tonnes ...
13-05-2024
-
Worley awarded Bayou Bend CCS carbon capture and storage facility contract
We’ve been selected to design and evaluate CO2 gathering, handling and sequestration facilities located along the Gulf Coast in Southeast Texas. Bayou Bend ...
13-05-2024
-
Black & Veatch delivers feasibility study for Andes Energy LNG Terminal
Global liquefied natural gas (LNG) infrastructure solutions leader Black & Veatch has completed a feasibility study for the planned Andes Energy Terminal, LNG regasification ...
09-05-2024
-
Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC
Shell Singapore Pte Ltd, a subsidiary of Shell plc, has reached an agreement to sell its Energy and Chemicals Park in Singapore to CAPGC Pte. Ltd., a joint venture company ...
08-05-2024
-
Integrated Global Services recognized for role in mega turnaround
Integrated Global Services has been recognized as a major contributor to the successful Ras Tanura Refinery 2024 Mega Turnaround and Inspection for Saudi Arabian Energy ...
08-05-2024
-
Ebara Elliott Energy to provide compressor for SAF project in Thailand
Ebara Elliott Energy, formerly Elliott Group, announces it has been contracted to provide a motor-driven recycle compressor with a variable frequency drive (VFD) for ...
07-05-2024
-
ETH Zurich select hte to provide high throughput test system designed for CO2 electroreduction
hte – the high throughput experimentation company was awarded a contract by the technical university ETH Zurich to provide a high throughput test system designed for ...
07-05-2024