Autoclave lining repair at a copper facility
In this audio case study, we discuss the application of Weld Metal Overlay in an African copper facility, detailing its impact on reducing corrosion, minimizing maintenance downtime, and enhancing operational efficiency.
-
Ethylene cracking furnace hot spot repair online
In this audio case study, we discuss a situation at a Gulf Coast chemical plant where an ethylene furnace encountered a hot spot challenge, requiring prompt action.
-
Furnace hot spot repair in the live tail gas Incinerator saves $156M
In this audio case study, learn how IGS's Hot Refractory Repair prevented a potential $156 million shutdown cost for a Central Asian oil and gas producer. It also highlighted the crucial role of proactive maintenance in sustaining uninterrupted energy production.
-
Larry Emch from IGS: Energy efficiency in furnaces
In this episode, Larry Emch, IGS Furnace Efficiency Specialist, shares the story of a site tackling excessive fuel usage and high emissions in their Steam Methane Reformer.
-
Mitigating Erosion: HVTS cladding solution for QAPCO quench column
In this case study, we discuss how IGS's High-Velocity Thermal Spray (HVTS) Cladding technology solved erosion issues in QAPCO's Quench Column VE140001.
-
Nugen Energy's refractory failure challenge
In this audio case study, Nugen Energy faced a significant challenge when their facilities began experiencing refractory failures, requiring extensive downtime for repairs. This downtime not only halted production but also led to substantial financial losses, nearly $6.59 million per ...
-
Overcoming severe refractory failure in a Saudi Arabian refinery
Today, we'll delve into the case study of how IGS significantly helped improve the operational efficiency of a Saudi Arabian Refinery by addressing a critical refractory failure. Our focus today centers on the innovative Hot-Tek Refractory repair services, implemented while the unit was ...
-
Solving coating issues in a carbon capture and storage project amidst new yearholidays
A critical issue arose during the construction of a groundbreaking direct air capture facility in the US Gulf Coast, risking the project timeline and costing over $500k per day in delays, as a particular coating specification for a vessel proved inadequate for the required environment ...
-
Successful revamp of a 40-year-old steam-methane reformer furnace
This episode examines a successful application of Cetek high emissivity coating to the radiant section of an SMR reformer which was experiencing excessive fuel firing.
-
Tube Tech increases thermal efficiency by 3% at Tupras Izmir refinery
In today's episode, explore the solution provided by Tube Tech (an IGS solution) that not only increased thermal efficiency by 3% at the Tupras Izmir Refinery in Turkey but also significantly enhanced heat transfer efficiency.