Overcoming severe refractory failure in a Saudi Arabian refinery

Today, we'll delve into the case study of how IGS significantly helped improve the operational efficiency of a Saudi Arabian Refinery by addressing a critical refractory failure. Our focus today centers on the innovative Hot-Tek Refractory repair services, implemented while the unit was operating at maximum capacity.

Other Podcasts

  • How a plant stopped CFB boiler tube repairs from 500 to 0

    In this audio case study, we'll talk about the changing maintenance strategy of the power plant operating two Circulating Fluidized Bed boilers. In 2015, they required 500 tube repairs across their units, leading to severe production disruptions. We'll explain why their boiler reliability was compromised ...

  • HVTS eliminates waste heat recovery boiler corrosion at copper smelter

    In this audio case study, we'll talk about the changing maintenance strategy of the power plant operating two Circulating Fluidized Bed boilers. In 2015, they required 500 tube repairs across their units, leading to severe production disruptions. We'll explain why their boiler reliability was compromised ...

  • Furnace hot spot repair in the live tail gas Incinerator saves $156M

    In this audio case study, learn how IGS's Hot Refractory Repair prevented a potential $156 million shutdown cost for a Central Asian oil and gas producer. It also highlighted the crucial role of proactive maintenance in sustaining uninterrupted energy production.

  • Autoclave lining repair at a copper facility

    In this audio case study, we discuss the application of Weld Metal Overlay in an African copper facility, detailing its impact on reducing corrosion, minimizing maintenance downtime, and enhancing operational efficiency.

  • IGS addressed a process vessel emergency on Christmas eve

    I'm going to tell you a Christmas story where we addressed an emergency for a refinery in Texas. This story highlights IGS's commitment to efficiency and reliability. We hope that you will not be facing emergencies during the holiday season, but if you do, you know who to call.
     

  • Mitigating Erosion: HVTS cladding solution for QAPCO quench column

    In this case study, we discuss how IGS's High-Velocity Thermal Spray (HVTS) Cladding technology solved erosion issues in QAPCO's Quench Column VE140001.

  • Successful revamp of a 40-year-old steam-methane reformer furnace

    This episode examines a successful application of Cetek high emissivity coating to the radiant section of an SMR reformer which was experiencing excessive fuel firing.

  • Tube Tech increases thermal efficiency by 3% at Tupras Izmir refinery

    In today's episode, explore the solution provided by Tube Tech (an IGS solution) that not only increased thermal efficiency by 3% at the Tupras Izmir Refinery in Turkey but also significantly enhanced heat transfer efficiency.

  • IGS ClearStream chromium-6 filtration for safe HVTS application

    In today's episode, explore the successful collaboration between IGS and a power & light facility as they address high-temperature corrosion in a gas turbine, utilizing innovative HVTS cladding, along with safety measures and environmental considerations, to ensure prolonged operational effic ...

  • SMARTGard HVTS Solution: Pulp Mill CFB Boiler Goals Achieved

    In this episode of "Efficiency and Reliability," learn how a Pulp Mill in the South Eastern United States overcame operational challenges to achieve their critical maintenance goals, including increasing boiler reliability, extending outage cycles, and reducing mechanical repairs, all through their ...